ALLIED CONTRACTORS · HOUSTON & DALLAS

UPS Battery Testing & Replacement

Batteries are the most common cause of UPS failure. Allied Contractors tests, monitors and replaces UPS batteries so your critical load rides through the gap between a utility outage and generator power.

REQUEST A QUOTE →
UPS battery strings in a data center battery room

THE SERVICE

The Weakest Link in Your Critical Power Chain

A UPS can only carry your load for as long as its batteries can deliver. One weak cell in a string can cut runtime or cause the whole string to fail during a transfer, often without warning on the UPS display.

Allied Contractors provides scheduled battery inspections, internal resistance and voltage testing, load testing, monitoring installation and planned replacement for VRLA, flooded wet cell and lithium-ion battery systems.

Battery work is usually scheduled with UPS maintenance and transfer switch testing as part of a data center service contract.

WHAT WE DO

UPS Battery Services

Battery Inspections

Visual inspection of jars, connections, cabinets and racks for swelling, leaks, corrosion and heat.

Impedance and Resistance Testing

Internal ohmic readings, cell voltages and temperatures trended over time to find weak cells early.

Load and Capacity Testing

Discharge testing against a load bank to confirm the runtime your critical load depends on.

Connection Torque and Cleaning

Inter-cell and terminal connection checks, cleaning and re-torque to manufacturer values.

Battery Monitoring Systems

Installation of continuous monitoring that alerts you to failing cells before they cause an outage.

Planned Replacement

Hot-swap or planned-outage replacement of strings or cabinets, with removal and recycling of old batteries.

Data center UPS room

TECHNICAL CONSIDERATIONS

What Shortens Battery Life

Most VRLA batteries are rated for years of service but often fail sooner in real conditions.

  • Battery room temperature above 77°F
  • Frequent discharges and incomplete recharge
  • Loose or corroded connections
  • Mixed-age or mixed-brand strings
  • Float voltage and charger settings outside manufacturer limits
  • Lithium-ion battery management system alarms and firmware

Ohmic trending is the most useful early warning, which is why we record readings at each visit and compare them to your baseline.

PLANNING THE WORK

How Battery Testing Is Planned

Testing is performed with the UPS online whenever possible. Capacity testing and replacements are scheduled with your team.

Baseline

Inventory strings, battery types, ages and monitoring, and record initial readings.

Test and Trend

Record voltage, resistance and temperature at each visit and flag cells that drift.

Replace on Plan

Recommend and schedule replacement before cells fail, with temporary bypass where needed.

WHERE WE WORK

Where UPS Batteries Protect Critical Loads

Data centers and colocation facilities, hospital and clinic IT and imaging rooms, manufacturing control rooms, telecom and network closets, and commercial buildings with security and emergency systems.

We work across Houston, Dallas–Fort Worth, Austin and San Antonio.

Data center UPS systems

WHY ALLIED CONTRACTORS

Licensed, Safety-Qualified Texas Electricians

Allied Contractors, LLC is a Texas commercial and industrial electrical contractor founded in 2019, with offices in Pasadena (Greater Houston), Dallas and Schulenburg and crews serving Houston, Dallas–Fort Worth, Austin and San Antonio.

  • Texas Electrical Contractor License TECL 34231
  • EMR 0.90
  • ISNetworld · Avetta · Veriforce
  • OSHA 10/30 and NFPA 70E trained crews

FREQUENTLY ASKED QUESTIONS

UPS Battery Questions

How often should UPS batteries be tested?

Many facilities inspect and test UPS batteries quarterly, with more detailed testing annually. Mission-critical sites often add continuous battery monitoring. Your manufacturer and NFPA 70B program set the minimum.

How long do UPS batteries last?

VRLA batteries are commonly replaced every three to five years in real conditions, while lithium-ion batteries usually last longer. Heat, discharges and maintenance all affect life.

Can batteries be replaced without shutting down the UPS?

Often yes. Many systems allow string-by-string replacement while the UPS stays online, or the load can be placed on maintenance bypass during replacement.

What is battery impedance or resistance testing?

It measures the internal resistance of each cell. A cell whose resistance rises compared with its baseline is losing capacity and is likely to fail.

Do you dispose of old batteries?

Yes. We coordinate removal and recycling of old batteries in line with applicable regulations.

LET'S DISCUSS YOUR FACILITY

Schedule UPS Battery Testing

Tell us your UPS models, battery types and ages. Allied Contractors will propose a testing and replacement plan for your critical power system.