New MCC Installation
Setting, anchoring, feeding and terminating new motor control center lineups for new lines and plant expansions.
ALLIED CONTRACTORS · HOUSTON, TEXAS
Install, expand, troubleshoot and maintain the motor control centers that run your production equipment, with work planned around your plant schedule.
REQUEST A QUOTE →
THE SERVICE
A motor control center groups the starters, drives, breakers and controls that run pumps, fans, conveyors, compressors and production machinery. When an MCC bucket fails or a section overheats, the equipment it serves stops.
Allied Contractors installs new MCCs and lineups, adds and replaces buckets, integrates drives and controls, and maintains existing equipment for manufacturing plants, processors, warehouses and industrial facilities in Greater Houston, Dallas–Fort Worth, Austin and San Antonio.
MCC work pairs naturally with our VFD repair and installation, PLC troubleshooting and plant shutdown support.
WHAT WE DO
Setting, anchoring, feeding and terminating new motor control center lineups for new lines and plant expansions.
Replacement and addition of starters, breakers and buckets, including retrofits to keep older lineups in service.
Adding drives and soft starters to MCC sections, with wiring, programming coordination and commissioning. See VFD controls.
Diagnosis of tripped starters, overloads, control failures and intermittent faults. See motor control troubleshooting.
Cleaning, inspection, torque checks, bus and connection inspection and thermal imaging on a planned schedule.
Updated bucket schedules, one-line markups, arc flash labels and as-built records.

TECHNICAL CONSIDERATIONS
MCCs in Texas plants range from new intelligent lineups to equipment that has been modified for decades. Before work begins we confirm what is actually installed and how the work affects production.
Related reading: VFDs vs PLCs: how they work together in industrial controls.
PLANNING THE WORK
Most MCC work requires de-energizing at least part of the lineup, so planning protects production.
Verify the bucket schedule, loads, ratings and condition of each section.
Group work by section and schedule it into shutdowns or low-production windows.
Complete the work, verify motor operation and update schedules, labels and drawings.
WHERE WE WORK
We work on motor control centers in manufacturing plants, steel and pipe fabrication, packaging, food and beverage, water and wastewater, distribution centers and other industrial facilities.
Most of our MCC customers also use Allied for industrial electrical services and ongoing manufacturing electrical service contracts.

WHY ALLIED CONTRACTORS
Allied Contractors, LLC is a Texas commercial and industrial electrical contractor founded in 2019, with offices in Pasadena (Greater Houston), Dallas and Schulenburg and crews serving Houston, Dallas–Fort Worth, Austin and San Antonio.
FREQUENTLY ASKED QUESTIONS
Many plants inspect and maintain MCCs annually, with thermal imaging in between. Harsh, dusty or high-load environments may need more frequent attention. NFPA 70B provides guidance for setting intervals based on equipment condition.
Often, yes. We confirm available spaces, bus ratings and manufacturer compatibility, then add or retrofit buckets for new motors and drives.
In many cases, yes. Bucket retrofits and component replacements can extend the life of an older lineup when the bus and structure are still in good condition.
Yes. We install and integrate drives into MCC sections and separate enclosures, including wiring and startup coordination.
Some inspection and thermal imaging can be done while energized. Most installation and maintenance requires de-energizing the affected section, which we plan around production.
RELATED ELECTRICAL SERVICES
LET'S DISCUSS YOUR FACILITY
Tell us about your motor control centers, the work needed and your production schedule. Allied Contractors will review and propose a plan.