Commercial & Industrial Standby Generator Installation in Houston

Permanent backup power that starts and carries your building when the grid goes down. Allied Contractors handles the electrical side of standby generator installation, from sizing and transfer switches to permits, startup and load testing.

REQUEST A QUOTE →
Standby generator installed in an industrial generator room

THE SERVICE

Standby Power Built Around Your Loads

A standby generator is only as reliable as the electrical system that connects it. Undersized feeders, a poorly chosen transfer scheme or unbalanced loads can leave a new generator unable to carry the building when it matters.

Allied Contractors installs diesel and natural gas standby generators for warehouses, manufacturing plants, offices, medical buildings, data rooms and multi-tenant properties. We work with your generator dealer or supplier on the engine and enclosure and own the electrical design, installation and testing.

New installations are paired with automatic transfer switches, an optional docking station for a second source, and ongoing generator electrical service.

WHAT WE DO

Generator Installation Services

Load Study and Sizing

Utility data, connected load and motor starting review to size the generator and decide which loads it must carry.

Transfer Switch Selection

Open- or closed-transition, service-entrance rated and bypass-isolation ATS options matched to your loads and code requirements.

Feeders and Distribution

Conduit, conductors, breakers and distribution between the generator, transfer switches and panels.

Pad, Placement and Permits

Coordination of pad, clearances, fuel, setbacks and city permits and inspections.

Startup and Load Testing

Startup with the dealer, phase rotation, transfer testing and load bank testing before the system is accepted.

Replacement and Upgrades

Replacing aging generators and transfer switches, or adding capacity as your facility grows.

Industrial generator connected for load testing

TECHNICAL CONSIDERATIONS

Design Decisions That Matter

The right installation depends on what the generator must protect and the rules that apply to it.

  • Emergency, legally required and optional standby systems under the NEC
  • Whole-building versus critical-load backup
  • Motor and UPS starting loads that drive generator size
  • Selective coordination of overcurrent devices
  • Service-entrance rated transfer switches and grounding
  • Natural gas supply versus diesel storage and runtime
  • NFPA 110 testing for emergency power supply systems

Facilities with emergency systems can follow up with NFPA 110 emergency power testing.

PLANNING THE WORK

How a Generator Installation Is Planned

Most of the work is done while the building stays on utility power, with one planned shutdown for the final tie-in.

Size and Design

Confirm loads, generator size, transfer scheme, location and permits.

Install While Energized

Set the pad and generator, run feeders and install transfer equipment ahead of the tie-in.

Tie In and Test

Make the final connection during a planned outage, then start up, transfer and load test.

WHERE WE WORK

Where We Install Standby Generators

Distribution centers, cold storage and manufacturing plants that cannot afford downtime; clinics and medical offices with patient care loads; offices, retail and multi-tenant buildings that need life safety and business continuity.

We install generators across Greater Houston, Dallas–Fort Worth, Austin and San Antonio.

Technician servicing an industrial generator

WHY ALLIED CONTRACTORS

Licensed, Safety-Qualified Texas Electricians

Allied Contractors, LLC is a Texas commercial and industrial electrical contractor founded in 2019, with offices in Pasadena (Greater Houston), Dallas and Schulenburg and crews serving Houston, Dallas–Fort Worth, Austin and San Antonio.

  • Texas Electrical Contractor License TECL 34231
  • EMR 0.90
  • ISNetworld · Avetta · Veriforce
  • OSHA 10/30 and NFPA 70E trained crews

FREQUENTLY ASKED QUESTIONS

Generator Installation Questions

Do you install the generator itself or only the wiring?

We handle the electrical design, transfer switches, feeders, connections, permits and testing, and coordinate with your generator dealer or supplier for the generator, enclosure and engine startup.

How do I know what size generator I need?

We review utility usage, connected loads and motor and UPS starting requirements, then decide which loads must run on backup power. That determines the generator size.

Should I back up the whole building?

Not always. Backing up only critical loads can allow a smaller generator and lower cost. We help you weigh the options.

How long does a commercial generator installation take?

Design, permitting and equipment lead time usually take the longest. The installation itself is often completed in a few weeks, with one planned outage for the tie-in.

Do you test the system after installation?

Yes. We verify phase rotation and transfer operation, and load test the generator before the system is turned over.

LET'S DISCUSS YOUR FACILITY

Plan Your Standby Generator Installation

Tell us what you need to keep running during an outage. Allied Contractors will size the system and propose a complete electrical installation.