Automatic Transfer Switch (ATS) Testing & Maintenance in Houston

Make sure your transfer switches move your load to generator power, and back, when an outage hits. Allied Contractors tests, maintains and repairs ATS equipment for critical, industrial and commercial facilities.

REQUEST A QUOTE →
Automatic transfer switch and generator equipment at a Houston facility

THE SERVICE

The Switch Between Utility Power and Backup Power

An automatic transfer switch watches utility power and, when it fails, signals the generator to start and transfers your load to it. When utility power returns, the ATS transfers back. If the switch sticks, a control fails or a setting is wrong, the generator can run while your building stays dark.

Allied Contractors provides ATS testing, preventive maintenance and corrective repairs for data centers, hospitals and clinics, manufacturing plants, warehouses and commercial buildings in Houston, Dallas–Fort Worth, Austin and San Antonio.

ATS work is usually planned together with generator electrical maintenance, generator load bank testing and UPS maintenance.

WHAT WE DO

ATS Services

Transfer Testing

Planned transfer and retransfer tests under real or simulated outage conditions, with timing and sequence verified against your requirements.

Preventive Maintenance

Inspection, cleaning, connection torque checks, contact and mechanism inspection and control checks performed to manufacturer guidance.

Controller and Settings Review

Verification of time delays, exerciser schedules, voltage and frequency pickups and generator start signals.

Bypass-Isolation Switches

Maintenance and operation of bypass-isolation ATS units so a switch can be serviced while the load stays powered.

Thermal Imaging

Infrared inspection of ATS connections and cabling under load to find hot spots before they fail. See thermal imaging.

Repair and Replacement

Corrective repairs, controller and component replacement, and full ATS replacement and installation when equipment reaches end of life.

Electrician testing industrial electrical equipment

TECHNICAL CONSIDERATIONS

Testing That Proves the System Works

A generator that starts on its weekly exercise has not proven that your building will transfer. Real confidence comes from testing the whole sequence: outage detection, generator start, transfer, load acceptance and retransfer.

  • Open- and closed-transition transfer types
  • Emergency, legally required and optional standby loads
  • Code and standard requirements that apply to your facility, such as NFPA 110 for emergency power supply systems
  • Coordination with generator, UPS and building systems
  • Approved outage windows and communication with occupants
  • Written test records for inspectors, insurers and auditors

Read our guide to preparing a facility for automatic transfer switch testing.

PLANNING THE WORK

How ATS Testing Is Planned

A transfer test affects real loads, so it is scheduled and communicated like any planned outage.

Inventory the Switches

List each ATS, its loads, rating, transition type, controller and service history.

Schedule the Test

Choose the window, notify affected departments or tenants, and confirm generator fuel and readiness.

Test, Record, Correct

Run the test sequence, record timing and findings, and recommend or perform corrective work.

WHERE WE WORK

Facilities That Depend on Transfer Switches

Data centers and colocation sites use transfer switches as part of layered redundancy with UPS and generators. Manufacturing plants use them to protect controls, safety systems and critical processes. Commercial buildings rely on them for life-safety and business-critical loads.

We perform ATS work in Greater Houston and across Dallas–Fort Worth, Austin and San Antonio, and can include it in a recurring electrical service contract.

Industrial electrical equipment being serviced

WHY ALLIED CONTRACTORS

Licensed, Safety-Qualified Texas Electricians

Allied Contractors, LLC is a Texas commercial and industrial electrical contractor founded in 2019, with offices in Pasadena (Greater Houston), Dallas and Schulenburg and crews serving Houston, Dallas–Fort Worth, Austin and San Antonio.

  • Texas Electrical Contractor License TECL 34231
  • EMR 0.90
  • ISNetworld · Avetta · Veriforce
  • OSHA 10/30 and NFPA 70E trained crews

FREQUENTLY ASKED QUESTIONS

ATS Testing Questions

How often should an automatic transfer switch be tested?

Many facilities exercise generators weekly or monthly and perform transfer tests under load monthly or periodically, with annual maintenance. Emergency and legally required systems may have specific requirements under the codes and standards that apply to your facility.

Does ATS testing cause an outage?

An open-transition transfer causes a brief interruption while the load moves between sources. Closed-transition and bypass-isolation designs can reduce or avoid that. We plan the test so affected loads and people are prepared.

What is the difference between a generator exercise and an ATS test?

A generator exercise runs the engine, often without load. An ATS test transfers the actual building load to the generator and back, proving the full sequence works.

Can you test ATS units from any manufacturer?

We test and maintain common commercial and industrial transfer switches. Where controller programming or warranty work requires the manufacturer, we coordinate with them.

Can ATS testing be part of a maintenance contract?

Yes. ATS testing and maintenance can be scheduled under a data center service contract or a facility electrical service contract.

LET'S DISCUSS YOUR FACILITY

Schedule ATS Testing for Your Facility

Tell us how many transfer switches you have, what they serve and when you can test. Allied Contractors will propose a testing and maintenance plan.