NFPA 110 sets how emergency and standby power systems must be tested, maintained and documented. Allied Contractors performs the electrical testing and keeps the records your inspectors, insurers and accreditors ask for.

REQUEST A QUOTE →
Generator and load bank array for emergency power testing

THE SERVICE

Proving Your Emergency Power System Works

NFPA 110, the Standard for Emergency and Standby Power Systems, applies to the generators, transfer switches and controls that serve emergency and legally required loads in hospitals, high-rises, assembly occupancies and many other buildings.

It calls for regular inspection, exercise under load, transfer switch operation, periodic load bank testing when monthly loading is too low, and written records. Many facilities fall behind on the documentation as much as the testing.

Allied Contractors performs and documents NFPA 110 electrical testing, coordinating with your generator mechanical service provider, and combines it with transfer switch testing and load bank testing.

WHAT WE DO

NFPA 110 Testing Services

Monthly Load Testing

Generator exercise under load with transfer switch operation, readings and records.

Transfer Switch Operation

Monthly transfer of emergency loads through each ATS, with timing recorded.

Annual Load Bank Testing

Supplemental load bank testing when monthly tests do not reach the required load.

Extended Duration Tests

Longer-duration tests at load for Level 1 systems, at the interval your edition requires.

Inspection and Maintenance

Electrical inspection of generator connections, controls, batteries, ATS and distribution.

Records and Reports

Test logs and reports organized for inspectors, insurers and accreditation surveys.

Technician inspecting a generator during testing

TECHNICAL CONSIDERATIONS

Understanding the Requirements

The exact requirements depend on the edition of NFPA 110 adopted in your jurisdiction and on whether your system is Level 1 or Level 2.

  • Level 1 systems, where failure could cause loss of life, and Level 2 systems
  • Monthly exercise at a minimum load or exhaust temperature
  • Annual supplemental load bank testing when monthly loading is not met
  • Extended-duration testing for Level 1 systems
  • Transfer switch operation and timing
  • Weekly inspections and written records kept by the owner
  • Healthcare requirements under NFPA 99 and CMS

We confirm which edition and level apply to your facility before setting up the schedule.

PLANNING THE WORK

How NFPA 110 Testing Is Scheduled

Most facilities set a recurring calendar so no test is missed.

Assess

Identify each system, its level, the edition that applies and your current records.

Schedule

Set monthly, annual and extended-duration tests on a calendar shared with your team.

Test and Record

Perform the tests, correct deficiencies and deliver organized records.

WHERE WE WORK

Who Needs NFPA 110 Testing

Hospitals and healthcare facilities, high-rise buildings, assembly and educational occupancies, data centers with emergency loads, and industrial facilities with legally required standby systems.

We test emergency power systems across Greater Houston, Dallas–Fort Worth, Austin and San Antonio, and can include testing in an electrical service contract.

Industrial generator inspection

WHY ALLIED CONTRACTORS

Licensed, Safety-Qualified Texas Electricians

Allied Contractors, LLC is a Texas commercial and industrial electrical contractor founded in 2019, with offices in Pasadena (Greater Houston), Dallas and Schulenburg and crews serving Houston, Dallas–Fort Worth, Austin and San Antonio.

  • Texas Electrical Contractor License TECL 34231
  • EMR 0.90
  • ISNetworld · Avetta · Veriforce
  • OSHA 10/30 and NFPA 70E trained crews

FREQUENTLY ASKED QUESTIONS

NFPA 110 Testing Questions

What does NFPA 110 require for generator testing?

NFPA 110 requires regular inspection, monthly exercise under load, transfer switch operation, supplemental load bank testing when monthly loading is too low, and written records. Exact requirements depend on the edition adopted and the system level.

What is the difference between Level 1 and Level 2?

Level 1 systems serve loads where failure could result in loss of life or serious injury. Level 2 systems are less critical. Level 1 systems have stricter testing requirements.

When is a load bank test required?

When monthly generator tests do not reach the minimum load or exhaust temperature set by the standard, an annual supplemental load bank test is required.

Do you perform the mechanical generator service?

We perform the electrical testing, transfer switch work and documentation, and coordinate with your generator mechanical service provider for engine service.

Do hospitals have additional requirements?

Yes. Healthcare facilities also follow NFPA 99 and the requirements of CMS and accrediting organizations, which reference NFPA 110.

LET'S DISCUSS YOUR FACILITY

Get Your Emergency Power Testing on Schedule

Tell us about your generators, transfer switches and current records. Allied Contractors will set up an NFPA 110 testing calendar for your facility.