Monthly Load Testing
Generator exercise under load with transfer switch operation, readings and records.
ALLIED CONTRACTORS · HOUSTON & TEXAS
NFPA 110 sets how emergency and standby power systems must be tested, maintained and documented. Allied Contractors performs the electrical testing and keeps the records your inspectors, insurers and accreditors ask for.
REQUEST A QUOTE →
THE SERVICE
NFPA 110, the Standard for Emergency and Standby Power Systems, applies to the generators, transfer switches and controls that serve emergency and legally required loads in hospitals, high-rises, assembly occupancies and many other buildings.
It calls for regular inspection, exercise under load, transfer switch operation, periodic load bank testing when monthly loading is too low, and written records. Many facilities fall behind on the documentation as much as the testing.
Allied Contractors performs and documents NFPA 110 electrical testing, coordinating with your generator mechanical service provider, and combines it with transfer switch testing and load bank testing.
WHAT WE DO
Generator exercise under load with transfer switch operation, readings and records.
Monthly transfer of emergency loads through each ATS, with timing recorded.
Supplemental load bank testing when monthly tests do not reach the required load.
Longer-duration tests at load for Level 1 systems, at the interval your edition requires.
Electrical inspection of generator connections, controls, batteries, ATS and distribution.
Test logs and reports organized for inspectors, insurers and accreditation surveys.

TECHNICAL CONSIDERATIONS
The exact requirements depend on the edition of NFPA 110 adopted in your jurisdiction and on whether your system is Level 1 or Level 2.
We confirm which edition and level apply to your facility before setting up the schedule.
PLANNING THE WORK
Most facilities set a recurring calendar so no test is missed.
Identify each system, its level, the edition that applies and your current records.
Set monthly, annual and extended-duration tests on a calendar shared with your team.
Perform the tests, correct deficiencies and deliver organized records.
WHERE WE WORK
Hospitals and healthcare facilities, high-rise buildings, assembly and educational occupancies, data centers with emergency loads, and industrial facilities with legally required standby systems.
We test emergency power systems across Greater Houston, Dallas–Fort Worth, Austin and San Antonio, and can include testing in an electrical service contract.

WHY ALLIED CONTRACTORS
Allied Contractors, LLC is a Texas commercial and industrial electrical contractor founded in 2019, with offices in Pasadena (Greater Houston), Dallas and Schulenburg and crews serving Houston, Dallas–Fort Worth, Austin and San Antonio.
FREQUENTLY ASKED QUESTIONS
NFPA 110 requires regular inspection, monthly exercise under load, transfer switch operation, supplemental load bank testing when monthly loading is too low, and written records. Exact requirements depend on the edition adopted and the system level.
Level 1 systems serve loads where failure could result in loss of life or serious injury. Level 2 systems are less critical. Level 1 systems have stricter testing requirements.
When monthly generator tests do not reach the minimum load or exhaust temperature set by the standard, an annual supplemental load bank test is required.
We perform the electrical testing, transfer switch work and documentation, and coordinate with your generator mechanical service provider for engine service.
Yes. Healthcare facilities also follow NFPA 99 and the requirements of CMS and accrediting organizations, which reference NFPA 110.
RELATED ELECTRICAL SERVICES
LET'S DISCUSS YOUR FACILITY
Tell us about your generators, transfer switches and current records. Allied Contractors will set up an NFPA 110 testing calendar for your facility.