ALLIED CONTRACTORS · HOUSTON & DALLAS

Paralleling Switchgear Maintenance & Testing

When several generators must start, synchronize and share load, the paralleling switchgear decides whether your facility stays powered. Allied Contractors maintains and tests it so the system works as designed.

REQUEST A QUOTE →
Multiple generators and paralleling equipment at a facility

THE SERVICE

Making Multiple Generators Act as One

Paralleling switchgear starts multiple generators, synchronizes them, closes them onto a common bus, shares load between them and adds or sheds load in priority order. It is common at data centers, hospitals and large plants.

Allied Contractors performs preventive maintenance on paralleling switchgear and breakers, verifies control sequences, supports load bank and full system testing and makes corrective repairs, coordinating with the switchgear and generator manufacturers.

Paralleling systems are tested with load bank testing and NFPA 110 emergency power testing, and maintained under our switchgear maintenance program.

WHAT WE DO

Paralleling Switchgear Services

Breaker Maintenance

Inspection, cleaning, lubrication and testing of generator and feeder breakers.

Synchronization Checks

Verification of synchronizers, sync-check relays and breaker close timing.

Load Sharing and Shed

Testing of load sharing, load add and load shed sequences under load.

Controls and PLC Review

Review of the master controls, alarms and settings with the manufacturer.

System Testing

Full-system tests and load bank tests that prove the paralleled system carries the facility.

Thermal Imaging

Infrared inspection of bus, breakers and connections under load.

Switchgear room with paralleling gear

TECHNICAL CONSIDERATIONS

What Can Go Wrong

Paralleling systems are complex, and small problems can cascade during an outage.

  • Failure to synchronize or close a generator breaker
  • Unequal load sharing that overloads one unit
  • Incorrect load add and shed priorities
  • Protective relay and breaker trip settings
  • Control power and battery health
  • Communication between switchgear, generators and building systems

PLANNING THE WORK

How Paralleling Testing Is Planned

Testing is scheduled like a planned outage, with clear roles for your staff, the manufacturers and our crew.

Plan

Review the sequence of operations, drawings and test goals, and write the procedure.

Maintain

Maintain breakers and controls in sections while the facility stays on utility power.

Prove

Run system and load bank tests and record timing, load sharing and findings.

WHERE WE WORK

Facilities With Paralleled Generators

Data centers and colocation campuses, hospitals and healthcare systems, large manufacturing and process plants, and campuses that share a central generator plant.

We serve Houston, Dallas–Fort Worth, Austin and San Antonio.

Technician inspecting generator controls

WHY ALLIED CONTRACTORS

Licensed, Safety-Qualified Texas Electricians

Allied Contractors, LLC is a Texas commercial and industrial electrical contractor founded in 2019, with offices in Pasadena (Greater Houston), Dallas and Schulenburg and crews serving Houston, Dallas–Fort Worth, Austin and San Antonio.

  • Texas Electrical Contractor License TECL 34231
  • EMR 0.90
  • ISNetworld · Avetta · Veriforce
  • OSHA 10/30 and NFPA 70E trained crews

FREQUENTLY ASKED QUESTIONS

Paralleling Switchgear Questions

What does paralleling switchgear do?

It starts several generators, synchronizes them, connects them to a common bus, shares load between them and adds or sheds loads in a set order.

How often should paralleling switchgear be tested?

Breakers and switchgear follow your maintenance program and manufacturer intervals, and the full system is commonly tested at least annually. Emergency systems also follow NFPA 110.

Can paralleling switchgear be maintained without an outage?

Much of it can be maintained in sections while the facility stays on utility power. Some work and full-system tests require a planned window.

Do you work with the switchgear manufacturer?

Yes. We coordinate with switchgear and generator manufacturers for control programming, firmware and warranty work.

Do you provide load banks for testing?

We support load bank testing and coordinate load bank rental and connection as part of the test.

LET'S DISCUSS YOUR FACILITY

Test Your Paralleling System

Tell us how many generators you have and how the system is controlled. Allied Contractors will propose a maintenance and testing plan.