ALLIED CONTRACTORS · HOUSTON & DALLAS

Data Center Busway Installation & Maintenance

Overhead busway puts power above every rack and lets you add capacity by plugging in a tap box. Allied Contractors installs, expands and maintains busway systems for data centers and critical facilities.

REQUEST A QUOTE →
Data center aisle with overhead power distribution

THE SERVICE

Flexible Overhead Power for the White Space

Overhead track busway replaces long runs of cable and conduit with a continuous powered rail. Tap boxes plug in wherever a rack needs power, so new deployments and moves take hours instead of weeks of electrical work.

Allied Contractors installs new busway runs, end feeds and tap boxes, expands existing systems, and performs inspection, torque checks and thermal imaging on installed busway. We also install feeder busway in plants and commercial buildings.

Busway is typically fed from PDUs or panelboards downstream of the UPS, and is part of our data center electrical services.

WHAT WE DO

Busway Services

New Busway Installation

Layout, support, installation and end-feed connection of overhead track busway for new halls.

Tap Box Installation

Plug-in tap boxes with the right breakers, receptacles and metering for each rack or row.

Expansions and Moves

Adding busway runs, relocating tap boxes and re-feeding rows as your layout changes.

Joint Inspection and Torque

Inspection and torque verification of joints, end feeds and supports.

Thermal Imaging

Infrared scans of joints, end feeds and tap boxes under load.

Feeder Busway

Plug-in and feeder busway for manufacturing plants, warehouses and commercial buildings.

Close-up of data center rack equipment

TECHNICAL CONSIDERATIONS

What Makes Busway Reliable

Busway is simple to use but unforgiving of poor installation.

  • Correct support spacing and seismic or vibration bracing
  • Joint torque and periodic re-torque
  • A and B feeds with matching tap box ratings
  • Metered tap boxes for rack-level power data
  • Clearances to cable trays, containment and fire protection
  • Labeling of every tap box and source

PLANNING THE WORK

How a Busway Project Is Planned

New installations are built before racks arrive. Expansions in live halls are performed under approved change windows.

Layout

Confirm rack layout, power densities, A and B feeds and support locations.

Install

Install supports, busway and end feeds, then tap boxes as racks are deployed.

Test and Label

Test, label and add busway to your drawings and maintenance program.

WHERE WE WORK

Where Busway Is Used

Colocation halls, enterprise and edge data centers, high-density AI and computing deployments, labs, and manufacturing lines that are moved or reconfigured often.

We install busway in Houston, Dallas–Fort Worth, Austin and San Antonio.

Technician in a data center aisle

WHY ALLIED CONTRACTORS

Licensed, Safety-Qualified Texas Electricians

Allied Contractors, LLC is a Texas commercial and industrial electrical contractor founded in 2019, with offices in Pasadena (Greater Houston), Dallas and Schulenburg and crews serving Houston, Dallas–Fort Worth, Austin and San Antonio.

  • Texas Electrical Contractor License TECL 34231
  • EMR 0.90
  • ISNetworld · Avetta · Veriforce
  • OSHA 10/30 and NFPA 70E trained crews

FREQUENTLY ASKED QUESTIONS

Busway Questions

What is data center busway?

Busway is a prefabricated overhead power rail. Plug-in tap boxes connect to it anywhere along its length to feed racks, so new power drops do not need new conduit and cable runs.

Can tap boxes be added while the busway is energized?

Many busway systems are designed for hot plug-in of tap boxes. We follow the manufacturer instructions and your safety procedures for every connection.

Is busway better than cable for data centers?

Busway is faster to reconfigure and keeps the space under raised floors and above racks clearer. Cable can cost less for fixed, low-density layouts. We help you choose.

How is busway maintained?

Busway joints and end feeds are inspected, thermally scanned and torque checked on a schedule set by the manufacturer and your NFPA 70B program.

Do you install feeder busway in plants?

Yes. We install plug-in and feeder busway in manufacturing plants, warehouses and commercial buildings.

LET'S DISCUSS YOUR FACILITY

Plan Your Busway Installation

Share your rack layout and power densities. Allied Contractors will design and install busway that grows with your data center.